US Duties on Solar Imports: What a Buyer Must Check Before Booking

US-bound solar modules can stack Section 201, Section 301 and AD/CVD. Here is the origin file, declarations and broker checks to run before you book.

A US-bound solar panel shipment can carry three duty layers at once: the Section 201 safeguard (30% in 2018, down to roughly 14% before it lapses in February 2026), Section 301 at 50% on Chinese-origin solar cells, and AD/CVD cash deposits that have ranged from single digits to well over 100% depending on who made the cell. Which layers apply is decided by your traceability file, not your invoice price.

Anti-Dumping and Countervailing Duty on Solar Panels: Which Orders Catch Your Cargo?

AD/CVD follows the company that produced the cell and the company that laminated the module, not the port of export, so relabelling a module as "Made in Vietnam" does not remove it from a China-scoped order if the cells came from China.

Two order families matter to most buyers. The China orders on cells and modules date from 2012 and have been reviewed many times since; combined deposit rates for some producers have exceeded 200% of entered value, while cooperating non-named producers sit at an all-others rate far below that. The second family covers cells and modules from Cambodia, Malaysia, Thailand and Vietnam, with determinations in 2025 that produced rates from low single digits for some cooperating producers to four-digit figures for non-cooperating ones. Treat every rate you read online, including ours, as a starting point and confirm the live case list with your broker, because rates reset at each administrative review.

Why the Producer's Legal Name Decides Your Rate

CBP assigns a cash deposit rate at entry based on the producer named on the entry summary. If your invoice names a trading company or a sales office rather than the plant that owns the cell line, the entry defaults to the all-others rate or, worse, to adverse facts available, which is the highest rate in the case. Get the exact legal entity for the cell plant and the exact legal entity for the module plant, and make sure both appear with matching addresses on the commercial invoice, the manufacturer's affidavit and the entry summary.

Why "Made in Vietnam" Is Not a Defence

Origin for AD/CVD purposes turns on where the essential character was created, and CBP has repeatedly found that modules assembled in a third country from Chinese cells remain within the scope of the China orders. A chamber-of-commerce certificate of origin does not override a scope ruling. What protects you is the cell purchase invoice, the cell lot numbers and a bill of materials tying a specific cell plant to a specific module serial number.

Section 201 Tariff on Solar Cells: What the Safeguard Adds on Top

Section 201 is an origin-blind safeguard on crystalline silicon cells and modules, so it stacks on top of Section 301 and AD/CVD rather than replacing either of them.

The safeguard opened at 30% in February 2018 and stepped down 5 percentage points a year; the 2022 extension restarted it at 14.75% and it declines to about 14% before the extension period ends in February 2026. A 2.5 GW tariff-rate quota covers cells imported for domestic assembly, which is why cell-only shipments into a US module plant behave differently from finished modules. The brief bifacial exemption was withdrawn in 2022, so frameless bifacial modules pay the same rate as monofacial. The duty base is customs value: under CIF that includes ocean freight and insurance, under FOB it does not, and on a 40ft HC of modules that gap is real money. Our Incoterms guide shows where that line falls.

Duty layerWhat it applies toTypical rate to modelProof you must hold
Section 201 safeguardAll c-Si cells and modules, any origin~14% and declining; lapses Feb 2026HTS classification 8541.43.00
Section 301Chinese-origin cells and modules50% on solar cells (raised in 2024)Country of origin per producer
AD/CVD, China ordersCells and modules produced in ChinaAll-others rate up to 200%+ producer-specificProducer legal name and case number on entry
AD/CVD, Southeast Asia ordersCambodia, Malaysia, Thailand, VietnamLow single digits to four digits for non-cooperatingCell lot traceability and bill of materials
UFLPA detentionModules with Xinjiang-linked polysiliconNot a duty; cargo held, then re-exportedPolysilicon and wafer source documents

Origin Documentation Requirements for US Solar Imports

You need a documentary chain that connects the finished module back to the polysilicon, wafer, cell and laminating plant, with names and addresses that match the entry line by line.

The Entry Packet

Traceability Under UFLPA

UFLPA is not a duty, but it stops cargo. CBP can detain a module shipment on a rebuttable presumption that a polysilicon input touched a listed entity, and the burden of rebuttal sits with the importer. A generic "no forced labour" letter is not enough; the file needs the polysilicon producer, the wafer plant, the cell plant and the invoices between them. Our certification walkthrough covers the paperwork side in more depth.

Incoming mono PERC cell cartons checked against supplier lot numbers and producer name at the Sansend May Solar factory

Supplier Declarations You Must Collect Before Booking

Collect these signed documents before you pay a deposit, because a declaration obtained after the container is on the water has no leverage behind it.

DeclarationWhat it must stateWho signs
Cell origin declarationProducing plant, country, cell lot numbers, efficiency binCell supplier quality manager
Module assembly affidavitAssembly plant address, BOM, serial range for your POModule factory legal representative
Polysilicon traceability letterPolysilicon and wafer sources, no listed entitiesFactory compliance officer
Flash-test and binning recordMeasured Pmax per serial, tolerance, calibration labQA or test lab
Certificate of originOrigin criterion and producer, not the traderChamber of commerce or issuing authority

A declaration signed by a sales manager with no seal is worth very little in a CBP response. Ask for the signatory's title, a company chop and a version on letterhead naming your PO. Pair it with per-serial test data, as described in our note on power tolerance and binning in bulk orders.

Red Flags in a Too-Cheap Quote

A quote more than roughly 8-10% below the market band for the same bill of materials usually means a duty assumption has been quietly moved onto the importer.

What actually moves price per watt shows how much of a genuine discount is BOM and how much is a duty assumption.

Working With a Customs Broker on Solar Entries

Hire a broker who has already filed solar entries under the current AD/CVD case numbers, because a generalist broker will file exactly what you hand them and the liability stays with you.

  1. Send the broker the producer legal names, HTS lines and case numbers before you book, and ask for a written duty estimate per layer.
  2. Confirm the customs value basis and how freight is treated under your Incoterms, since CIF inflates the duty base.
  3. Have the broker file a scope inquiry or request a binding ruling if the origin chain is unusual, and do it before the vessel arrives.
  4. Remember that the cash deposit is provisional: the administrative review sets the final rate, which can come out higher or lower.
  5. Retain the entry file for at least five years, because CBP audits and EAPA evasion investigations can reopen an old entry.

What I Check in the Factory Before Signing an Origin Declaration

I walk the cell store first. The cartons in front of me have to carry the same producer name and lot numbers that appear on the declaration I am about to sign, and I photograph them next to the packing list so the file carries a date. Then I pull three serial numbers at random from the finished pallet and trace them back through the flash-test database to the cell bin and the laminate shift; if the serial is not in the database, the traceability chain is fiction no matter what the certificate says. We keep IEC 61215 and IEC 61730 reports plus the UL 61730 listing current for US orders, and I check the PID result to IEC 62804 against the actual encapsulant and glass in the BOM, because a certificate issued for a different BOM protects nobody. Buyers who audit before the first order rarely find a problem at the port; buyers who book on price alone often do. See our factory and certification page, browse the product catalogue, or request a quote with your destination port and Incoterm.

Finished solar modules packed for a US order with serial numbers matched to the packing list before booking

Frequently Asked Questions

Do solar panels from Vietnam or Malaysia still pay US anti-dumping duty?

Possibly. The 2025 AD/CVD orders cover cells and modules from Cambodia, Malaysia, Thailand and Vietnam, and modules assembled there from Chinese cells can also fall inside the older China orders. The deposit rate depends on the producer named at entry, so ask your supplier for the exact producing legal entity and confirm the live case list with a customs broker before booking.

Is the Section 201 solar tariff still in force today?

The safeguard was extended in 2022 at 14.75% and steps down annually, with the extension period ending in February 2026. It applies to crystalline silicon cells and modules from any country, so it stacks with Section 301 and AD/CVD. Confirm the rate in force on your entry date with your broker, because the schedule changes every year.

How do I avoid AD/CVD on solar imports legally?

There is no legal way to avoid a duty that applies to your goods; there is a legal way to avoid being surprised by one. Build a traceability file naming the polysilicon, wafer, cell and module producers, put the producer's legal name on the entry summary, get a written duty estimate per layer, and file a scope inquiry if the chain is unusual.

Who is liable if my supplier under-declares the invoice value?

The importer of record. CBP assesses duty on the declared value, and where that value is understated the IOR pays the difference plus penalties, even if the exporter prepared the invoice. Never accept a suggestion to split invoices or lower the transaction value; it turns a pricing question into a fraud exposure that follows the importer for years.

What documentation does CBP need for a solar module import?

Commercial invoice with HTS 8541.43.00 and the producer's legal name, packing list, bill of lading, manufacturer's affidavit, certificate of origin, polysilicon and wafer traceability records, module serial list, and the UL 61730 safety listing alongside IEC 61215 and IEC 61730 certificates. AD/CVD case numbers must appear on the entry, and the file should be kept for at least five years.

Get a quote for this topic