How to Write a Custom Solar Panel RFQ: 10 Specs That Decide Whether Your OEM Order Ships Right
A vague RFQ means requotes and rejected containers. Here are the 10 specs every custom solar panel RFQ must define before a Chinese factory can quote.
Introduction: The RFQ Is the Real Product
Ask ten factories to quote a 300-watt custom solar panel and you will get ten different products: different glass thickness, different cell layouts, different junction boxes, different cable lengths — and ten prices that cannot be compared. Whichever interpretation the factory happened to build becomes the panel in your container. This is the most expensive mistake in custom solar sourcing, and it never happens at the factory. It happens in the RFQ.
We run a custom panel line in Shenzhen that ships OEM and ODM orders to distributors, EPC contractors, telecom operators and solar pump companies across Southeast Asia, the Middle East and Africa. When an order goes wrong — a container held at Mombasa, a re-quote after tooling is already cut, a golden sample that passed and a bulk run that did not — the root cause is almost always a spec the buyer never wrote down. This guide covers the ten specs a custom solar panel RFQ must define before any factory can quote responsibly, what goes wrong when each one is missing, and the language that gets you comparable quotes from every supplier on your list.

Why Vague RFQs Cost More Than Bad Factories
A request that reads high quality, best price, about 300W forces the factory to guess. The guess is always the cheapest compliant interpretation, because that is the quote that wins the comparison. The consequences land months later, at the worst possible moment:
- Requotes after tooling. A buyer in Jakarta specified 300W panels without defining cell count or dimensions. The factory cut framing tooling for one layout, then the buyer changed the layout after seeing the sample. The tooling charge was billed twice and the lead time restarted.
- Rejected shipments. A Lagos importer received panels whose nameplate wattage did not match the flash-test data in the certificate file. Nigerian customs questioned the discrepancy, the container sat at the port, and demurrage exceeded the panel margin.
- Unquotable comparisons. Three quotes for the same 400W panel differed by 22% — because one included a 3.2mm front glass, one included a lighter 2.0mm glass, and one was frameless. The buyer compared prices, not products.
- Warranty exposure. An EPC in Riyadh ordered panels for a rooftop project without specifying mechanical load ratings. The factory shipped a standard 2400 Pa module for a site that needed 5400 Pa snow-load capability. The client rejected the frames after installation had begun.
None of these are factory failures. Each one is an RFQ that left a decision to someone who had never seen the destination market.
The 10 Specs Your Custom RFQ Must Define
1. Physical Dimensions and Tolerances
State length, width and thickness in millimetres, plus the tolerance you accept. A factory default is typically plus or minus 0.5 mm on frame dimensions and plus or minus 1 mm on diagonal. For retrofits — replacing panels in an existing RV roof rack, a marine hatch or a telecom cabinet — the tolerance matters more than the nominal size. Ask for a dimensioned drawing with tolerances in writing, and specify whether the junction box and cable exit must sit on the short or long edge. If your panel must fit an existing mounting rail or a curved roof section, say so in the RFQ; the factory will quote a frameless or semi-flexible construction instead of a standard aluminium frame.
2. Rated Power and Power Tolerance
Write Pmax at STC — for example 300 W — and the tolerance band you accept. The industry default is 0 to plus 5 W, meaning a 300 W panel can ship at anything from 300 to 305 W. Bulk buyers who need tighter binning should specify 0 to plus 3 W and expect a small price premium. Require that every panel ships with an individual flash-test report showing measured Pmax, and that the nameplate wattage matches the measured value. If your market bills by installed capacity — feed-in tariffs, net metering, or a tender scored on kilowatts — tolerance is not a detail, it is the price.
3. Cell Technology and Layout
Specify the cell type and size: TOPCon or PERC, 166 mm or 182 mm format, full-cell or half-cut, and the number of busbars. For a 300 W panel this decides everything downstream — a 166 mm full-cell layout needs 60 cells, a half-cut layout needs 120 half-cells, and the two products are not interchangeable. If your buyer values high-temperature performance — and every market from Dakar to Dubai does — specify TOPCon with a temperature coefficient of minus 0.29 %/degree C or better, and note whether you want a bifacial rear side. The factory needs this before it can quote cells, and the cell choice moves the price by more than most buyers expect.
4. Front, Back and Frame Construction
Define the laminate stack: front glass thickness (3.2 mm tempered is standard, 2.0 mm for weight-critical RV and marine builds), backsheet material (white PET or black for aesthetics), and frame or frameless. For curved or low-profile roofs, ask about ETFE front sheets and a frameless laminate. For standard rooftop and ground-mount projects, an anodised aluminium frame with a documented wind and snow load rating is the safer default. If the panel will be walked on, bolted to a curved surface, or mounted with adhesive rather than clamps, say it here — this single line decides whether the factory quotes a glass-glass laminate or a flexible module.
5. Full Electrical Parameters
Pmax alone is not a spec. Require the factory to commit to the full datasheet set: open-circuit voltage (Voc), short-circuit current (Isc), voltage at maximum power (Vmp), current at maximum power (Imp), and maximum system voltage — 1000 V or 1500 V DC depending on your inverter and string design. For off-grid and pump projects in Africa and SEA, Vmp and Imp decide whether the panel matches your controller or pump inverter, and a mismatch is discovered at the site, not at the port. Also specify temperature coefficients for power, voltage and current, and the NOCT rating. A factory that will not commit to these numbers in the contract is quoting a marketing sheet, not a product.
6. Junction Box, Cables and Connectors
Specify junction box IP rating (IP68 is the export standard), the number of bypass diodes (three for a 300 W panel, one per cell string group), cable cross-section (4 mm2 is standard) and cable length per side — 300 mm for rooftop strings, 900 mm or more for pump and marine installs where the run is long. Name the connector standard explicitly: MC4-compatible is the default, but if your market uses a different brand, say so. For marine and high-humidity markets, require potted diodes and glued cable glands. A junction box that fails in salt spray takes the whole string with it, and this is the most common failure we see in returned marine panels.
7. Mechanical and Environmental Ratings
State the mechanical load the panel must survive: 2400 Pa wind load and 5400 Pa snow load is the standard rooftop rating; desert and coastal sites need more. Then specify the environmental tests that matter for your market: IEC 61701 salt mist for coastal Kenya, Vietnam and the Gulf; ammonia resistance for agricultural sites; PID resistance for humid tropical installations; and a fire class rating if your insurer or municipality requires it. Each additional test is a line on the quotation, and each missing test is a claim waiting to happen.
8. Destination Certifications
IEC 61215 and IEC 61730 are the baseline; CE is required for most SEA and Middle East tenders. But the destination market adds its own gate: SONCAP for Nigeria, SABER for Saudi Arabia, KEBS and EPRA for Kenya, INMETRO for Brazil, SNI for Indonesia. Put the required certificate list in the RFQ and ask the factory to confirm in writing that the certificate model number matches the panel you are ordering. A certificate that names a different model is the fastest way to have a container held, and it is discovered after payment, not before.
9. Nameplate, Labeling and Branding
If this is an OEM or private-label order, define exactly what appears on the nameplate: your brand, the model number, the wattage, the certification marks, and Made in China. Specify carton markings — handling icons, wattage, quantity per carton, and any barcode your warehouse system scans. Request a nameplate proof for approval before the bulk run, and confirm whether the factory holds the certificate in its own name with a letter of authorisation for your brand, or a private-label annex. Settle this before the first shipment; it is far cheaper than re-labelling a container at destination.
10. Packaging and Shipping Preparation
Ask for the carton specification in writing: single-layer vertical packing with corner protectors is the export standard for glass-glass panels; flexible and lightweight panels need different protection against compression. Specify pallet size for your 40 ft HC container, desiccant and moisture barrier for monsoon transshipment, and whether cartons are printed or plain. Panels that arrive with crushed corners fail the buyer-side inspection before anyone measures their output, and packaging is the cheapest spec in the RFQ to get right.
Beyond the Spec Table: What the Factory Also Needs
Specs define the product; four commercial inputs define the quote:
- Target price band. Tell the factory what you sell the finished panel for. A factory that knows your market can propose the right construction instead of guessing.
- Annual volume. Even an estimate — 500 pieces now, 5,000 next year — changes the tooling and cell-layout strategy.
- Timeline. Sample first, then bulk? A 30-day sample window plus a 25 to 35 day bulk lead time is typical for custom builds; standard-stock panels ship faster but cannot be customised.
- Destination and use case. Rooftop, marine, pump, telecom, RV. The use case resolves half the spec questions before they are asked.
The Sample Gate: Golden Sample and Pre-Production Approval
Never approve a custom order from a quotation alone. Order a pre-production sample — 10 to 20 pieces is normal, at two to three times the unit price — and treat it as a gate, not a courtesy:
- Measure Pmax on every sample with your own flash tester or an independent lab; compare against the quoted datasheet.
- Check dimensions, cable lengths, junction box position and nameplate against the RFQ line by line.
- Request an EL image of at least one sample to check for microcracks in the cell layout.
- Sign and retain one sample as the golden sample, photographed and dated, and reference it in the purchase contract.
The golden sample is your evidence if the bulk run drifts. Without it, your word against the factory's is the only dispute mechanism you have.
Seven RFQ Phrases That Trigger a Bad Quote
| Vague phrase | What to write instead |
|---|---|
| High quality | IEC 61215 and IEC 61730 certified, with test reports |
| Waterproof | Junction box IP68, potted diodes, glued cable glands |
| About 300W | Pmax 300 W at STC, tolerance 0/+5 W, flash report per panel |
| Standard size | Length 1640 mm, width 992 mm, thickness 35 mm, tolerance plus/minus 0.5 mm |
| Good for hot weather | Temperature coefficient minus 0.29 %/degree C or better |
| Long cables | 900 mm per side, 4 mm2, MC4-compatible connectors |
| Fast delivery | Sample within 30 days, bulk within 25 days of approval |
Reading the Factory's Quote Back
A comparable RFQ produces comparable quotes, and the next skill is reading them. Ask every factory to return the quote against your spec line by line, with the datasheet attached — not a generic catalogue sheet. Three checks catch most problems before you sign anything:
- Line items, not a lump sum. A quote that shows one price for the panel and no breakdown hides the tooling, the sample run and the certification costs. Require separate lines for unit price, NRE/tooling, sample cost, and any certificate fees.
- Datasheet matching. Compare the returned datasheet against your spec table. If the quoted Voc, Vmp or cable length differs from your RFQ and the price is lower, you are being quoted a different product — usually a thinner glass, a smaller cable or a cheaper junction box. That gap is where the container rejection comes from.
- Certificate model number. Confirm in writing that the IEC or CE certificate the factory holds names the exact model being quoted. Certificates that cover a similar-but-different model are common, and the discrepancy surfaces at customs, after payment.
If two quotes differ by more than 15 percent for the same spec, one of them is not quoting the same product. Do not award the order until the gap is explained in writing.
A Copy-Paste RFQ Template
Send this to every factory on your list; the responses will finally be comparable:
We are sourcing a custom solar panel for [market/use case]. Requirements: dimensions [L x W x T] mm with tolerance [x] mm; Pmax [x] W at STC, tolerance [0/+x] W, individual flash report per panel; cell technology [TOPCon/PERC], [166/182] mm, [full/half] cut, [x] busbars; front [3.2 mm glass / ETFE], backsheet [material], [framed/frameless]; Voc [x] V, Isc [x] A, Vmp [x] V, Imp [x] A, max system voltage [1000/1500] V DC; temperature coefficient [x] %/degree C; junction box IP68 with [x] bypass diodes, cable [x] mm2, length [x] mm per side, connectors [type]; mechanical load [x] Pa; certifications required [list]; nameplate and carton branding [details]; packaging [spec]. Please quote sample and bulk pricing with lead times, tooling/NRE costs, and confirm the certificate model number in writing.
Where to Go Next
Custom panels are a factory capability; the RFQ is the buyer capability. Get the spec sheet right and every quote you receive describes the same product — then price is the only variable left. Browse our custom solar panels, standard solar panels and solar cells for OEM programs, and read our related guides on OEM/ODM custom panel manufacturing, custom-shaped panel engineering rules and private-label OEM branding decisions.
Frequently Asked Questions
What should a custom solar panel RFQ include?
Ten specs, at minimum: physical dimensions with tolerances, rated power with tolerance band, cell technology and layout, front/back and frame construction, the full electrical parameter set including Voc, Isc, Vmp and Imp, junction box and cable specification, mechanical and environmental ratings, destination certifications, nameplate and carton labeling, and packaging. Add your target price band, annual volume, timeline and use case, and the factory can quote a defined product instead of its cheapest interpretation.
What MOQ and lead time should I expect for a custom solar panel order?
Minor customisation — cable length, connector brand, nameplate — starts around 50 to 100 pieces with almost no one-off cost. A full custom build with tooling, such as non-standard dimensions or a custom frame, realistically needs 1,000 pieces or more, with tooling of roughly USD 2,000 to 8,000. Plan 30 days for a pre-production sample and 25 to 35 days for the bulk run after sample approval. Standard-stock panels ship faster but cannot be customised.
Do I need to send engineering drawings, or is a spec table enough?
For rectangular framed or frameless panels, a complete spec table is enough — factories build those layouts every day. Send a dimensioned drawing, in DXF or PDF, when the panel is non-rectangular, has cut-outs or cable exits in non-standard positions, must bend to a curve, or must fit an existing mounting rail. For anything irregular, a drawing removes the guesswork that turns into a rejected sample and a second tooling charge.
How do I stop the factory from quoting a cheaper spec than I specified?
Write the spec into the purchase contract, not just the quotation, and gate the order on samples. Order 10 to 20 pre-production pieces, measure Pmax on each with your own flash tester, check dimensions and nameplate against the RFQ line by line, request an EL image for microcracks, and sign and retain one golden sample referenced in the contract. Require an individual flash-test report with every panel and confirm the certificate model number in writing before the bulk run.